These videos are before and after on the top floor bedroom. Please take a look at the amount of effort that went into sheeting up and preparation.
The second video is the bedroom after having a full reskim. The customer was very happy with the curves and how clean the room was left after plastering.
Preparation work prior to reskimming the cinema room.
This is the skimmed cinema room.